Customization: | Available |
---|---|
Sample: | Free Sample |
MOQ: | 5000m² |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Firsta Group is a professional manufacturer and supplier of antistatic PET film. It could be used to minimize dust absorption for the die-cutting process of optical components for masking tape, double side adhesive tape, and also the protection of inner adhesive tape in the die-cutting process.
PROPERTY | TEST METHOD | UNIT | TYPICAL VALUE |
Thickness | ASTM D 374 | micron | 75 |
Haze | ASTM D 1003 | % | 2.5 |
Transmittance | ASTM D 1003 | % | 92 |
Gloss (45°) | ASTM D 2457 | % | 85 / 90 |
Heat Shrinkage (MD/TD) | BMS TT 0.2 (150ºC, 30min) | % | 1.5 / 0 |
Tensile Strength (MD/TD) | ASTM D 882 | MPa | 230 / 240 |
Anti-static Value | Static Tester | Ω | 106 |
Surface Tension | ASTM D 2578 | mN/m | 52 |
* Stable electrostatic value, non-decay permanently
* Resistant to friction and alcohol
* Resistant to boiling
Q1. What information should I let you know if I need to get a quotation?
A. Material
B. Specifications (thickness, width, length)
C. Application (Used for labels / tapes / packaging)
D. Shipping terms
E. Order quantity and frequency What is the MOQ (minimun order quantity)?
Q2. What is the MOQ (minimun order quantity)?
Generally, the MOQ is 1 ton or 10,000 square meters, depending on different products.
Q3. Is it okay to provide samples?
Yes, of course it's ok for us to provide samples for your testing. Q3. Is it okay to provide samples?
If you need, please feel free to contact us at any time.
Q4. What about the lead time for mass production?
Generally, 15~30 days after receiving the advance payment, depending on different products and the production schedule.